| test fitting all the joints one last time before onsite assembly glue-up 4" redwood strips 1/4" thick weaved into frame |
|
|
| Steam bending the weaved boards was necessary to prevent breaking |
| Privacy panel was supported by (3) 2 1/2" galvanized steel pipes pile driven >30" below grade. there was no way to dig any post holes or pour cement without destroying the existing vegetation |
| 6 months later |
![]() |
| 1 year after installation. Almost seams silly to have weaved anything now. |

No comments:
Post a Comment