test fitting all the joints one last time before onsite assembly glue-up 4" redwood strips 1/4" thick weaved into frame |
Steam bending the weaved boards was necessary to prevent breaking |
Privacy panel was supported by (3) 2 1/2" galvanized steel pipes pile driven >30" below grade. there was no way to dig any post holes or pour cement without destroying the existing vegetation |
6 months later |
1 year after installation. Almost seams silly to have weaved anything now. |