Monday, October 14, 2019
Saturday, October 5, 2019
Saturday, June 29, 2019
Adding a Privacy Panel or Fence Extension for propogating persimmon vine clones to grow over. Without digging post holes or mixing any concrete!
test fitting all the joints one last time before onsite assembly glue-up 4" redwood strips 1/4" thick weaved into frame |
|
Steam bending the weaved boards was necessary to prevent breaking |
Privacy panel was supported by (3) 2 1/2" galvanized steel pipes pile driven >30" below grade. there was no way to dig any post holes or pour cement without destroying the existing vegetation |
6 months later |
![]() |
1 year after installation. Almost seams silly to have weaved anything now. |
Thursday, April 4, 2019
New MorningStar XD prefinished bamboo flooring installed throughout the whole house. Solid bamboo not laminated 1100sqft [before and after]
Living room (after) by Stand Out Construction, Richmond CA |
![]() |
Living room (before) |
![]() |
Living/Dining room (before) |
![]() |
Master bedroom (before) |
![]() |
Master bedroom (before) |
![]() |
Second bedroom (before) |
![]() |
Third bedroom (cold hard tile) |
New Solid Bamboo floor. No nails. Floating install snap together pre-finished |
Living room entry |
still finishing floors in the rest of the house so were using the empty boxes to protect the new floors |
protection removed Living/Dining room. No dust. |
Living room w/ new baseboards installed |
view from living room looking down hallway to 3 bedrooms |
Hall closet this is where you look if you want to know how good your floor guys are... no gaps or traced door jambs |
Third bedroom off hallway Room transitions are required on floating floors for seasonal movement. These transition pieces were made from leftover flooring too match perfectly |
Third bedroom |
Master bedroom (done) |
Master bedroom (opposite view) |
Looking out the M. bedroom at the Hallway that turns and becomes the laundry area and leads the the second bedroom |
Second bedroom |
Wednesday, July 26, 2017
Webster St Redwood Deck Project Oakland June 2017
New Deck is 99% done. I'm just mocking up the handrails before the final inspection from City of Oakland. |
before... |
extra wide stairs |
No screw holes or seams |
![]() |
My 3D rendering made from home owners drawings |
another convenient side staircase |
City of Oakland code compliant 42" tall railings w/ all gaps <4" diameter |
old deck |
New side-stair landings poured |
Sunday, May 28, 2017
Full Kitchen Remodel 2016 - San Pablo CA
kitchen after! |
kitchen before... |
kitchen before 02 |
kitchen after 02 |
Pocket door delete |
Goodbye pocket door |
old cabinets removed |
Rewiring kitchen to meet todays building code requirements |
old cabinets removed |
crawl space access found under fridge next to pocket door |
original home of gas range (left side of window) before being relocated |
Pocket door deleted and gas range relocated. New counter tops finished with undermount sink |
New cabinets and counter top |
Pocket door is gone and gas range occupies the new wall space |
Recessed lighting installed |
under cabinet lighting installed |
fridge cabinet coming together |
cabinet base trim and crown moulding complete |
plumbing fixtures finished |
Walls painted |
Finished and functioning kitchen remodel completed |