Monday, October 14, 2019
Saturday, October 5, 2019
Saturday, June 29, 2019
Adding a Privacy Panel or Fence Extension for propogating persimmon vine clones to grow over. Without digging post holes or mixing any concrete!
| test fitting all the joints one last time before onsite assembly glue-up 4" redwood strips 1/4" thick weaved into frame |
|
|
| Steam bending the weaved boards was necessary to prevent breaking |
| Privacy panel was supported by (3) 2 1/2" galvanized steel pipes pile driven >30" below grade. there was no way to dig any post holes or pour cement without destroying the existing vegetation |
| 6 months later |
![]() |
| 1 year after installation. Almost seams silly to have weaved anything now. |
Thursday, April 4, 2019
New MorningStar XD prefinished bamboo flooring installed throughout the whole house. Solid bamboo not laminated 1100sqft [before and after]
| Living room (after) by Stand Out Construction, Richmond CA |
![]() |
| Living room (before) |
![]() |
| Living/Dining room (before) |
![]() |
| Master bedroom (before) |
![]() |
| Master bedroom (before) |
![]() |
| Second bedroom (before) |
![]() |
| Third bedroom (cold hard tile) |
| New Solid Bamboo floor. No nails. Floating install snap together pre-finished |
| Living room entry |
| still finishing floors in the rest of the house so were using the empty boxes to protect the new floors |
| protection removed Living/Dining room. No dust. |
| Living room w/ new baseboards installed |
| view from living room looking down hallway to 3 bedrooms |
| Hall closet this is where you look if you want to know how good your floor guys are... no gaps or traced door jambs |
| Third bedroom off hallway Room transitions are required on floating floors for seasonal movement. These transition pieces were made from leftover flooring too match perfectly |
| Third bedroom |
| Master bedroom (done) |
| Master bedroom (opposite view) |
| Looking out the M. bedroom at the Hallway that turns and becomes the laundry area and leads the the second bedroom |
| Second bedroom |
Wednesday, July 26, 2017
Webster St Redwood Deck Project Oakland June 2017
| New Deck is 99% done. I'm just mocking up the handrails before the final inspection from City of Oakland. |
| before... |
| extra wide stairs |
| No screw holes or seams |
![]() |
| My 3D rendering made from home owners drawings |
| another convenient side staircase |
| City of Oakland code compliant 42" tall railings w/ all gaps <4" diameter |
| old deck |
| New side-stair landings poured |
Sunday, May 28, 2017
Full Kitchen Remodel 2016 - San Pablo CA
| kitchen after! |
| kitchen before... |
| kitchen before 02 |
| kitchen after 02 |
| Pocket door delete |
| Goodbye pocket door |
| old cabinets removed |
| Rewiring kitchen to meet todays building code requirements |
| old cabinets removed |
| crawl space access found under fridge next to pocket door |
| original home of gas range (left side of window) before being relocated |
| Pocket door deleted and gas range relocated. New counter tops finished with undermount sink |
| New cabinets and counter top |
| Pocket door is gone and gas range occupies the new wall space |
| Recessed lighting installed |
| under cabinet lighting installed |
| fridge cabinet coming together |
| cabinet base trim and crown moulding complete |
| plumbing fixtures finished |
| Walls painted |
| Finished and functioning kitchen remodel completed |